The project aims to the Rehabilitation of BP offshore facilities including steel structural platforms, topside facilities and subsea pipelines.
The aim of the overall rehabilitation project was to make sure that the whole system could safely operate for at least additional 25 years maintaining the best possible operating conditions and capacities. A qualitative risk-based approach had been followed for the whole 119 platforms in order to evaluate the hazard of structural failure.
The offshore facilities consist of 9 complexes & 69 satellites (with an overall count of 119 platforms and 400 wells) and 1600 km of sub-sea pipelines.
Argonaut is fully responsible for the designs, fabrication, supply, installation, testing, adjustment, balancing and Guarantee of the HVAC and pressurizing system for the Offshore Installation.
In order to meet the special requirements of the project; items are to be fabricated with the following special specs: